Case Study

white arrow icon

apT Case study

Mattlock Avenue

Added: 10/12/2018

The foundations needed to be taken down to good firm Halesowen clay, this was over lain with pit spoil clay of varying depths, and some areas need excavating over 2.5m. During winter months this could also lead to banks collapsing if not concreted...

Read More